PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Set the door frames at the 1st floor Atroneys Room Facing East.jpg Started installing Stair -3 Facing West.jpg Installing Exterior metal framing at the 2nd floor Facing West.jpg Installing motorized dampers at the 1st floor Facing North.jpg Installing sprinkler branches-heads at the 3rd floor Facing West.jpg Laying out block at the 2nd floor detention cells facing South.jpg Metal tracks for the 2nd floor exterior framing Facing West.jpg Finished erecting the stone panels at the South Elevation.jpg Installed pipe hangers at the 4th floor Facing West.jpg
Previous pageNext page Installing sprinkler branches-heads at the 3rd floor Facing West
Installing sprinkler branches-heads at the 3rd floor Facing West